Aquatech has been selected to deliver a comprehensive, endtoend water solution for the world’s first large-scale green steel plant, under a 25-year design-build-operate-maintain (DBOOM) agreement. The site’s Water Island™ includes a ZLD system that recovers 99% of the plant’s wastewater, cooling water management, and ultrapure water for hydrogen electrolyzers.
The success of the Stegra project rests on close collaboration, shared vision, and long-term commitment to delivering cutting edge water management for a world-leading industrial project. Close collaboration between Stegra, Aquatech, and John Laing has been instrumental in ensuring the successful execution of this pioneering undertaking.